Pre-Construction

Pongbembe HPP

Pongbembe site is a run-of-river hydro power plant located in the city of Tana Toraja, South Sulawesi. We are targeting construction to begin in 2020 and will be commercially operational by 2023. The installed capacity of the plant is 18.0 MW with an estimated annual energy output of 106,590 MWh.

Detail Project

Capacity

18 MW

Status

Pre-construction

Location

South Sulawesi

Net Head

287 meter

Turbine Type

Pelton Turbine

Turbine Manufacture

-